skip navigational links United States Department of Labor
July 4, 2009   
DOL Home > ESA > WHD > Data Collection Completed
DOL Home

Wage and Hour Division (WHD)

Printer-Friendly Version

ESA OFCCP OLMS OWCP WHD
Wage and Hour Division - To promote and achieve compliance with labor standards to protect and enhance the welfare of the nation's workforce.

Quick Links

Data Collection Completed

The data for the following surveys are now under review. Listed for each survey is the area surveyed, types of construction, survey time frame, survey cut-off date (which is the date that data submissions must be postmarked by to be included in the survey), and a person to contact regarding the survey.

 

Survey-Schedule

Survey Starts-

Data-Collection-Completed

Survey-Results

Arkansas, Connecticut, District of Columbia, Florida, Kentucky, Maine, Maryland, Michigan, Minnesota, Missouri, New Jersey, New York, Oregon, Tennessee, Texas, Virginia, Washington


ARKANSAS ----

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy, Highway
SURVEY TIME FRAME: 01-01-03 through 12-31-03
SURVEY CUT-OFF DATE: 09-30-04
CONTACT: Bobby Mitchell (972) 850-2634


CONNECTICUT

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Heavy, Highway & Residential
SURVEY TIME FRAME: 01-01-01 through 12-31-01
SURVEY CUT-OFF DATE: 08-01-02
CONTACT: Maria Duffy (215) 861-5832


DISTRICT OF COLUMBIA

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy & Highway
SURVEY TIME FRAME: 11-01-03 through 10-31-04
SURVEY CUT-OFF DATE: 08-25-05
Contact: Eileen Furey (215) 861-5837


FLORIDA

AREA SURVEYED: Statewide Florida
TYPE OF CONSTRUCTION: Building, Residential, Heavy and Highway
SURVEY TIME FRAME: 09-01-2003 through 08-31-2004
SURVEY CUT-OFF DATE: 06-02-2006
CONTACT: Nancy Mason (865) 974-4422


KENTUCKY

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy, & Highway
SURVEY TIME FRAME: 01-01-05 through 12-31-05
SURVEY CUT-OFF DATE: 07-06-07
CONTACT: Eleanor Blanton (404) 893-4541


MAINE

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Heavy, Highway & Residential
SURVEY TIME FRAME: : 04-01-01 through 03-31-02
SURVEY CUT-OFF DATE: 09-27-02
CONTACT: Helen Klein (215) 861-5834


MARYLAND

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy & Highway
SURVEY TIME FRAME: : 11-01-03 through 10-31-04
SURVEY CUT-OFF DATE: 08-25-05
CONTACT: Rosalind Laws/Helen Klein (215) 861-5835/5834


MICHIGAN

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy, Highway
SURVEY TIME FRAME: 01-01-03 through 12-31-03
SURVEY CUT-OFF DATE: 08-20-04
CONTACT: Judy Andrews (312)596-7206

MINNESOTA

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Heavy, Highway & Residential
SURVEY TIME FRAME: : 01-01-01 through 12-31-01
SURVEY CUT-OFF DATE: 09-30-02
CONTACT: Judy Andrews (312) 596-7216


MISSOURI

AREA SURVEYED: Statewide Missouri
TYPE OF CONSTRUCTION: Building, Heavy, Highway & Residential
SURVEY TIME FRAME: 01-01-04 through 12-31-04
SURVEY CUT-OFF DATE: 05-26-06
CONTACT: Judy Andrews


NEW JERSEY

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy
SURVEY TIME FRAME: 07-01-03 through 12-31-03
SURVEY CUT-OFF DATE: 8-31-04
CONTACT: Maria Duffy (215) 861-5830


NEW YORK

AREA SURVEYED: Rural Counties
TYPE OF CONSTRUCTION: Building & Residential
SURVEY TIME FRAME: 01/01/2004 through 12/31/2004
SURVEY CUT-OFF DATE: 09/29/2006
CONTACT: Maria Duffy (215) 862-5832


OREGON

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy, Highway
SURVEY TIME FRAME: 08-01-03 through 07-31-04
SURVEY CUT-OFF DATE: 01-31-05
Contact: Sylvia Lee (415) 848-6629


TENNESSEE

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy, & Highway
SURVEY TIME FRAME: 01-01-05 through 12-31-05
SURVEY CUT-OFF DATE: 08-31-07
CONTACT: Eleanor Blanton (404) 893-4541


TEXAS

AREA SURVEYED: 177 rural counties *See Below
TYPE OF CONSTRUCTION: Building, Residential, & Heavy
SURVEY TIME FRAME: 05-01-05 through 04-30-06
SURVEY CUT-OFF DATE: 07-27-07
CONTACT: Deborah Hollins (972) 850-2627

*Anderson, Andrews, Angelina, Bailey, Baylor, Bee, Blanco, Borden, Bosque, Brewster, Briscoe, Brooks, Brown, Burnet, Camp, Cass, Castro, Cherokee, Childress, Cochran, Coke, Coleman, Collingsworth, Colorado, Comanche, Concho, Cooke, Cottle, Crane, Crockett, Culberson, Dallam, Dawson, DeWitt, Deaf Smith, Dickens, Dimmit, Donley, Duval, Eastland, Edwards, Erath, Falls, Fannin, Fayette, Fisher, Floyd, Foard, Franklin, Freestone, Frio, Gaines, Garza, Gillespie, Glasscock, Gonzales, Gray, Grimes, Hale, Hall, Hamilton, Hansford, Hardeman, Harrison, Hartley, Haskell, Hemphill, Henderson, Hill, Hockley, Hood, Hopkins, Houston, Howard, Hudspeth, Hutchinson, Jack, Jackson, Jasper, Jeff Davis, Jim Hogg, Jim Wells, Karnes, Kenedy, Kent, Kerr, Kimble, King, Kinney, Kleberg, Knox, LaSalle, Lamar, Lamb, Lavaca, Lee, Leon, Limestone, Lipscomb, Live Oak, Llano, Loving, Lynn, Madison, Marion, Martin, Mason, Matagorda, Maverick, McCulloch, McMullen, Menard, Milam, Mills, Mitchell, Montague, Moore, Morris, Motley, Nacogdoches, Navarro, Newton, Nolan, Ochiltree, Oldham, Palo Pinto, Panola, Parmer, Pecos, Polk, Presidio, Rains, Reagan, Real, Red River, Reeves, Refugio, Roberts, Runnels, Sabine, San Augustine, San Saba, Schleicher, Scurry, Shackelford, Shelby, Sherman, Somervell, Starr, Stephens, Sterling, Stonewall, Sutton, Swisher, Terrell, Terry, Throckmorton, Titus, Trinity, Tyler, Upton, Uvalde, Val Verde, Van Zandt, Walker, Ward, Washington, Wharton, Wheeler, Wilbarger, Willacy, Winkler, Wood, Yoakum, Young, Zapata, & Zavala.

TEXAS

AREA SURVEYED: 16 metropolitan counties *See Below
TYPE OF CONSTRUCTION: Building, Residential, & Heavy
SURVEY TIME FRAME: 05-01-05 through 04-30-06
SURVEY CUT-OFF DATE: 07-27-07
CONTACT: Deborah Hollins (972) 850-2627

Archer, Armstrong, Callahan, Carson, Clay, Crosby, Ector, Irion, Jones, Lubbock, Midland, Potter, Randall, Taylor, Tom Green & Wichita.


VIRGINIA

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Residential, Heavy & Highway
SURVEY TIME FRAME: 11-01-03 to 10-31-04
SURVEY CUT-OFF DATE: 08-25-05
CONTACT: Tamara Harris (215) 861-5839


WASHINGTON

AREA SURVEYED: Statewide
TYPE OF CONSTRUCTION: Building, Heavy, Highway & Residential
SURVEY TIME FRAME: 01-01-01 through 12-31-01
SURVEY CUT-OFF DATE: 09-30-02
CONTACT: Frank Morelli (415) 848-6626

 

 

Phone Numbers